A low number on a proposal does not tell you whether two contractors priced the same work. The useful comparison is scope against scope: preparation, layout responsibility, materials, special markings, access planning, exclusions and closeout. These questions help expose the differences before work begins.

1. What exactly is included in the proposal?

Ask for a written count or description of stall lines, arrows, crosswalks, curbs, symbols, words and other marked areas. Confirm whether cleaning, layout, masking, traffic control and mobilization are included.

A proposal should also identify exclusions. Surface repairs, heavy oil treatment, marking removal, sign fabrication or engineered design may require a separate scope.

  • Marking quantities or clearly defined areas
  • Preparation and cleanup
  • Layout source and approvals
  • Phasing and access responsibilities
  • Excluded surface or specialty work

2. Who is responsible for the layout?

For restriping, determine whether the crew will trace the existing pattern and whether that pattern has been reviewed for conflicts. For a new or changed layout, ask what approved plan or owner direction controls dimensions and placement.

Contractors can provide practical field-layout support, but code-sensitive design and final legal or engineering determinations may belong to the property’s design professional or governing authority.

3. How will the surface be evaluated and prepared?

Paint performance depends heavily on the surface beneath it. Ask how loose debris, moisture, heavy dirt, oil, failing pavement, sealcoat and old markings will be handled.

The strongest answer may sometimes be to delay painting until repair or cure conditions are met. A contractor who documents those limits gives the owner a clearer expectation than one who promises the same result on every surface.

4. What is the access and weather plan?

The proposal should explain what areas must be clear, whether work is phased and how schedule changes will be communicated. Confirm who moves vehicles, notifies occupants and maintains barricades.

Ask how temperature, moisture and forecast conditions affect mobilization and reopening. Avoid relying on a universal dry-time claim that ignores the selected coating and field conditions.

5. How are quality and closeout documented?

Confirm that the property contact can review the approved scope and completed work. Ask how missed areas, punch-list items or layout questions are documented and resolved.

Any warranty or corrective-work commitment should appear in the signed proposal. Website language or a casual verbal promise should not replace the written project terms.

Compare complete value, not just line-item price

A clear proposal reduces surprises for both the property and the crew. Compare whether each bidder understood the same lot, markings, preparation, access restrictions and handoff expectations.

References and permission-approved project examples can be useful, but they should be authentic and relevant to the type of property being evaluated. Ask for evidence without accepting anonymous or unverifiable claims.

Quote-ready checklist

What to gather before you call

  • Written, comparable scope
  • Layout responsibility identified
  • Surface preparation explained
  • Weather and phasing plan
  • Insurance and business information confirmed
  • Closeout and written warranty terms
Start a property-specific quote